Use hourly pricing (time and materials) for troubleshooting and anything you can’t see into, and flat rates for jobs you’ve done enough times to know the hours. Either way, both come from the same number: your hourly rate. Get that right and the rest is arithmetic.
Work out your hourly rate from your costs
Start with a year. Add up everything the business has to pay for, including you:
| Yearly cost (example) | Amount |
|---|---|
| Your own pay | $70,000 |
| Insurance (liability, health, other) | $9,000 |
| Truck: payment, fuel, insurance, upkeep | $14,000 |
| Tools, meters, ladders, replacements | $3,000 |
| License renewal and continuing education | $1,000 |
| Phone, software, accounting, advertising | $5,000 |
| Tax set-aside (ask your accountant) | $10,000 |
| Total | $112,000 |
Now the part most people get wrong: divide by the hours you can bill, not the hours you work. Driving, quoting, supply-house runs, callbacks and paperwork all take time nobody pays for. In this example, 50 weeks at 40 hours is 2,000 hours, and about 65% of them are billable: 1,300 hours.
- •Break-even rate: $112,000 ÷ 1,300 hrs = $86.15/hr
- •Add 15% profit for slow months, new tools and growth: $86.15 × 1.15 = $99.08
- •Round it: $100/hr
For comparison, the U.S. Bureau of Labor Statistics put the median wage for employed electricians at $30.38 an hour in May 2025. That’s what a shop pays its electrician before the truck, insurance, tools and office, which is why the rate you bill has to be far above any wage. If your rate comes out much higher than what others charge in your area, look at your billable hours first. That’s the number most worth a second look.
How to price electrical work: hourly, flat rate, or both
- •Hourly (time and materials): you bill the hours worked plus materials. Best for troubleshooting, old houses and open-ended work. You’re protected if the job runs long, but the customer can’t predict the total, so give a range and agree to call before you go past it.
- •Flat rate: one price for a defined job. Best for work you repeat. Customers like knowing the price, and you keep the benefit when you work fast. The risk is underestimating, so your terms should say hidden conditions are priced as a change.
- •Both: flat prices for the known jobs, hourly for troubleshooting and anything beyond the agreed list. Say which applies before you start, and lay out the invoice the same way.
Build flat rates into a price book
A price book is your list of common jobs with a set price for each. You don’t need software to start one. A note on your phone works. For each job:
Here’s the math at the example rate of $100/hr and a 30% materials markup:
| Job (example) | Hours | Labor | Materials | Flat price |
|---|---|---|---|---|
| Replace outlet with GFCI | 0.75 | $75 | $26 ($20 cost) | $105 |
| Hang customer-supplied ceiling fan on existing fan-rated box | 1.5 | $150 | $7 ($5 cost) | $160 |
| Add 20A circuit, about 30 ft, open basement | 3 | $300 | $78 ($60 cost) | $380 |
| Install customer-supplied Level 2 EV charger, new 50A circuit, about 35 ft | 5 | $500 | $260 ($200 cost) | $760 |
Two things this table leaves out on purpose. Drive time: either add a trip charge or build your average drive into the hours. Permits: they go on top, at cost (see step 5). Track your real hours on each job type and adjust the book every few months.
Mark up materials
Charging materials at cost means working for free while you source them. The markup pays for trips to the supply house, carrying stock on the truck, and handling returns and warranty claims.
- •The math: price = cost × (1 + markup). A $200 part at 30% markup is $260.
- •Markup isn’t margin: that $60 is 30% of your cost but only 23% of the $260 price. Don’t mix the two up when you check your numbers.
- •Big-ticket items: you might use a lower percentage on panels, chargers and generators, and a higher one on small parts. Whatever you choose, apply it the same way every time.
- •Customer-supplied equipment: there’s no material to mark up, and you don’t control the part’s quality. Price the labor as a flat job, and note on the invoice that you installed it but didn’t supply it.
On the invoice, list materials on their own lines at your selling price. For how to lay that out, see how to invoice for parts and labor.
Price permits and inspections
Permit fees are set by your city or county, so look them up for each job rather than guessing. The fee usually goes on the estimate and invoice at cost, on its own line. What electricians forget is the time around it:
- •Applying for the permit, online or at the counter.
- •Being on site for the inspection, or a return trip to meet the inspector.
- •A re-inspection if something fails. If it was your mistake, that’s on you. If the inspector wants changes to existing wiring outside your scope, it’s a priced change.
Build that time into the job price, or bill it as its own line.
Price it on site, invoice it from the truck
Set a minimum charge and a service call fee
A ten-minute fix costs you the same drive, setup and paperwork as an hour-long one. Two ways to cover it:
- •Minimum charge: the least you’ll bill for any visit, for example one hour at your rate ($100 in this example). If the work comes in under it, the invoice shows one minimum-charge line instead of labor.
- •Service call fee: a set fee for showing up and diagnosing, plus the repair on top. You can credit it toward the repair if the customer goes ahead. If you do, show the fee and the credit on the invoice.
Either way, tell the customer when they book. A minimum they hear about first on the invoice feels like a trick.
Put it in writing and check it
Write the price on an estimate before you start, with how it’s priced and what’s not included. The free electrical estimate template has a box for the existing system you saw and terms for hidden conditions. When the job’s done, bill it with the electrician invoice template.
- •Dividing by the hours you work instead of the hours you bill.
- •Flat-rate prices with no clause for hidden conditions.
- •Selling materials at cost.
- •Forgetting permit time and the inspection trip.
- •Copying a competitor’s price without knowing your own costs.
- •Leaving the same rates in place for years while your costs go up.
A good price only counts once it’s paid. If an invoice runs late, here’s when to follow up on an unpaid invoice.
Key Takeaways
Enough to cover your pay, your business costs and a profit, divided by the hours you can actually bill. Add up a year of costs, divide by your billable hours, then add a margin. Your local market sets the ceiling, but your costs set the floor, so start there.
Each suits different work. Flat rate is better for jobs you’ve done enough times to know the hours, like outlets, fixtures and EV chargers. Hourly is better for troubleshooting and old wiring, where you can’t know the time until you’re in it. You can use both, as long as you tell the customer which applies before starting.
There’s no single right number. The markup pays for your time sourcing parts, trips to the supply house, carrying stock and handling returns and warranty claims. Pick a percentage, apply it the same way every time, and remember that a 30% markup is only about a 23% margin on the selling price.
That’s your call. You might keep estimates for planned installs free, because the estimate is how you win the job. Troubleshooting is different: finding the problem is the work, so a service call or diagnostic fee makes sense. You can credit that fee toward the repair if the customer goes ahead.
The least you’ll bill for any visit, because the drive, setup and paperwork cost the same whether the fix takes ten minutes or an hour. For example, one hour at your rate. Tell the customer when they book, and show it as one line on the invoice instead of a labor line.
Break it into tasks you have done, estimate each one, and add a buffer for the unknown. If you can’t estimate it with confidence, price it hourly with a range and a point where you’ll call the customer before going further, and write down your real hours so you can flat-rate it next time.